Scope

Engineering Design, Procurement, and Construction Management of a new 60 MMSCFD Refrigeration Plant with 60 MMSCFD of Gas Compression consisting of an Inlet Separator, Compressor Packages, Refrigeration Plant, Condensate Storage Tanks, Water Storage Tanks, LPG Storage Bullets, Instrument Air System, Slop Tank, De-Ethanizer Package, De-Butanizer Package, Condensate Stabilizer Package, Flare Knock Out Drum, Flare Stack, Sales and Fuel Gas Meter Skid, and associated piping.

All piping and utilities are designed for 90 MMSCFD future expansion. Complete EPCM support of all mechanical, electrical, civil, instrumentation, and control aspects of the project including start-up and commissioning.

Client

Perpetual Operating Corp.

Location

10-03-52-17 W5M