Close
Save

Flared Gas to Power

260 BBL/day C3+ product

Phase 1

3 Jenbacher 1.4 MW reciprocating engines

Phase 2

4.2 MW

Initial Permitted Output

Scope

Flared Gas to Power project which captures low-pressure flared gas to generate power under SaskPower’s PGPP program classified as “Carbon Neutral” generation. Phase 1 includes the addition of gas processing with the recovery of 260 BBL/day of a C3+ product. Phase 2 includes the addition of three (3) Jenbacher 1.4 MW reciprocating engines for an initial permitted output of the facility is 4.2 MW.

Client

Anonymous

Location

Saskatchewan

Gallery