Birley Compressor Station

2

Multi-well Pad Sites

25 MMSCFD

Gas Compression

50 BBLS/MM

Condensate

Scope

Engineering Design, Procurement, and Construction Management of 2 Multi-well Pad Sites, Gas Gathering Pipelines, and Central Compressor Station sized for 25.0 MMSCFD & 50 BBLS/MM Condensate (2.0 % H2S).

Central Facility consisting of an Inlet Separator, Compression, Dehydration, Fuel Gas Sweetening, Islanded Power Generation c/w with 100% back-up, Condensate and Water Storage, VRU, and Utility Systems.

Complete EPCM support of all mechanical, electrical, civil, instrumentation, and control aspects of the project including start-up and commissioning. (Project start-up Q2 2016)

Client

Chinook Energy Inc.

Location

a-72-F/94-H-3