Medicine Hat (AB) 48.5 MW CC Generation

  • Name: Unit 16, 48.5 MW Combined Cycle Power Generation Plant
  • Client: City of Medicine Hat
  • Location: Medicine Hat, Alberta

  • Scope: 2-year Project Management contract for design, construction and start-up of this Power Plant Project including planning and scheduling, procurement assistance, cost control, construction coordination and administration. Supply and installation of a General Electric 48.5 MW natural gas combustion turbine generator package, along with associated utilities / power transmission infrastructure to tie-in to existing 69 kV power system. Power Generation facility to operate as a simple-cycle “Peaker” plant; designed to start up and reach maximum capacity within 10 minutes, providing electricity to the grid promptly at times of peak demand. In-service date: October 2017.