Fort St. John Area (BC) Birley Compressor Station

  • Name: Birley Compressor Station
  • Client: Chinook Energy Inc.
  • Location: a-72-F/94-H-3

  • Scope: Engineering Design, Procurement, and Construction Management of 2 Multi-well Pad Sites, Gas Gathering Pipelines and Central Compressor Station sized for 25.0 MMSCFD & 50 BBLS/MM Condensate (2.0 % H2S). Central Facility consisting of an Inlet Separator, Compression, Dehydration, Fuel Gas Sweetening, Islanded Power Generation c/w with 100% back-up, Condensate and Water Storage, VRU, and Utility Systems. Complete EPCM support of all mechanical, electrical, civil, instrumentation and control aspects of the project including start up and commissioning. (Project start-up Q2 2016)